Looking at the collectors from the side. Shown is a row of lighting MEC installed.
|
| Owner: |
L.A. Department of Public Works Engineering Bureau |
| Engineer: |
HDR Engineering |
| General Contractor: |
Kiewit Pacific Co. |
| Location: |
Playa Del Rey, CA |
The Primary Battery B Modifications project at the Hyperion Treatment Plant, called for the refurbishing and modernization of Batter B. MEC worked as a subcontractor to Kiewit Pacific Company. Because this was an upgrade to an existing facility, MEC electricians performed all work while the plant was continously operating. Installation and upgrades consisted of:
- Modifications to the Motor Control Center
- Modifications to the Distributed Control System
- Installation of longitudinal collectors
- Replacing the primary sludge pumps
- Replacing the sludge collection system
- New stainless steel effluent launders
|
|