On the morning of May 5, 2005, a MEC crew met outside the Local Union Hall in Dorchester, MA to begin the two day installation of a 149 foot tall, 100 kW wind turbine. MEC’s work consisted of:

  • Installing all the electrical wiring
    - Installing the cables from the nacelle (generator) to the foundation
    - Connecting the data and speed controls
  • Setting the tower base and top tower
  • Assembling the  blade
  • Installing the nacelle
  • Start -up testing

 

The wind generator produces enough electricity to power thirty five homes annually. However, for the Local Union Hall, it supplies thirty - five percent of the electricity to run the twenty classrooms, ten shops, boardroom and auditorium of the three-story training facility. The entire installation took approximately six weeks, from pouring the foundation to the final step of installing the generator and finalizing all electrical connections.