WMATA REPLACEMENT OF TRACTION POWER EQUIPMENT
Washington, D.C.
This design-build project included the replacement of traction power equipment in 33 existing substations and building a training simulator at WMATA’s Telegraph Road facility. Mass. Electric’s scope of work in each substation included the installation of new:
- DC and AC panels
- Annunciators
- Insulated “Amazite” floor where required
- Isolation transformers
Work also included:
- High and medium voltage terminations and testing
- Rigging of all new equipment into the substations
- Replacement of the Uninterruptible Power Supply and batteries in six of the substations
- Testing and commissioning of all new switchgear
- Installation of all control cable
WMATA required a minimum number of switchgear cubicles remain online at all times. Temporary cathode breakers were required in some substations to facilitate the safe removal and replacement of existing switchgear.